Skip to content

Olympic Ceremonies in Temporary Stadium to Continue with Closing Ceremony Set for Feb. 25

Olympic Ceremonies in Temporary Stadium to Continue with Closing Ceremony Set for Feb. 25

PYEONGCHANG, South Korea – A parade of visual designs from an international team of designers were seen by spectators within the 35,000-capacity PyeongChang Olympic stadium venue, and also via TV and internet to millions of viewers around the globe on Feb. 9, with an overall theme of “Peace in Motion.” The $78-million stadium was built specifically for the opening and closing ceremonies only, not for sporting events. The structure will next be used for the Closing Ceremonies on Feb. 25, and also for the Paralympics, March 9-18, before being dismantled.

Read More »

MEGA Lumen8 Lighting Console

Mega-Lite’s new Lumen8 platform includes a 27-inch touch screen built into the unit. The console is set up to be controlled with a programming interface that is both intuitive and powerful, letting users spend more time creating and less time having to learn complex commands. The console is also built with top of the line components designed to be durable. The Lumen8 includes a UPS power supply that will power the unit for up to 15 minutes in the case of power loss. Lumen8 also includes a unique tilted back connector plate to easily connect DMX, Art-Net, extra monitors (sold separately), power and other USB devices.

Read More »