TMB ProPlex Network Helps Make Olympic Magic
LONDON – The 2012 London Olympic Game Opening and Closing Ceremonies used eight kilometers (4 miles) of fiber optic cable to control and synchronize LED, lasers, lighting, projection, audio, motion control and pyro. A significant element of the network was a system of ProPlex GBS Gigabit Switches and Fiber Cable from TMB.
Read More »